Each project follows a structured execution sequence to maintain control, repeatability and safety.
Drilling and preparation
Injection points are drilled with minimal disturbance. Hole spacing and depth are adjusted according to soil conditions, floor or foundation structure and load distribution.
Controlled injection
Geopolymer material is injected in stages. Expansion is controlled to densify weak ground and fill voids without causing uncontrolled movement.
Real-time monitoring
Structural movement is continuously monitored during injection. Lift, level changes and ground response are measured to ensure that targets are met safely and accurately.
Verification and adjustment
Injection parameters are adjusted during execution based on observed response, keeping treatment focused on the required zones.
This staged approach prevents over-pressurisation and uncontrolled lifting.