Floor Lifting

Fast, precise and non-invasive floor lifting

Floor lifting with GEOLIFT geopolymers is a fast, precise and non-invasive solution for sunken and uneven floors. Using controlled geopolymer injection, we stabilise the ground beneath the floor, restore level and support, and reduce disruption compared to traditional reconstruction.

Laser level monitoring during indoor floor stabilisation with geopolymer injection

Floor lifting without demolition or downtime

GEOLIFT specialises in lifting and levelling sunken and uneven floors in private homes, commercial buildings and industrial facilities using advanced geopolymer injection technology. The method restores floor stability and usability without demolition, excavation or long downtime.

In many cases, floor lifting can be carried out from outside the building without disturbing the indoor environment. Where internal injections are needed, the work is planned to minimise disruption. Injection points are agreed with the client in advance, and the holes are small — usually no more than 10 mm in diameter.

Floor lifting with laser level monitoring and geopolymer injection

How floor lifting works

  • Small injection holes are drilled in the affected floor area.
  • GEOLIFT resin is injected beneath the floor through steel injection pipes under controlled pressure.
  • The resin expands, fills voids, stabilises the base and gradually restores level and support.
  • The process is monitored with laser levelling equipment to ensure controlled and precise results.
Before and after floor stabilisation with geopolymer injection

Advantages of GEOLIFT floor lifting

  • No excavation or demolition required
  • Minimal downtime — areas are often usable within hours
  • Precise control with laser monitoring
  • Stabilises the ground beneath the floor
  • Durable and long-lasting results
  • Cost-effective alternative to full reconstruction
GEOLIFT injection equipment for floor lifting and ground stabilisation

Applications

  • Private homes with sunken or uneven floors
  • Warehouses and logistics centres
  • Production facilities with heavy machinery loads
  • Commercial buildings, offices and retail spaces

Process

A simple process from inspection to completed floor lifting

Most projects are completed in 1–2 days.

  • 1

    Site assessment

    1-3 days
  • 2

    Technical proposal and estimate

    1 day
  • 3

    Floor lifting and stabilisation

    1-2 days

Payment by instalments is available. Our partners can help you find a suitable financing offer through banks.

Request a free floor lifting consultation

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Drop files here or
Accepted file types: jpg, png, jpeg, pdf, Max. file size: 50 MB.