Under constant 40-ton loading every five minutes, the quarry weighbridge slabs settled due to severe subsoil compression. Geopolymer injections restored level and bearing capacity within 5 hours — completed outside working hours with zero operational downtime.
Object: Silikaat Sand Mine
Location: Tallinn, Estonia
Sector: Mining / Quarry
Technology: Geopolymer injections under BAM slab
Product used: GEO LIFT R035
Injection depth: 0.8 m below concrete slabs
Duration: 5 hours
Owner: Silikaat AS
Contractor: Geolift International OÜ
Engineer: Valdas Kordusas